Hi Mahesh,
There is no material wise data. If you need material wise you need to do calculation on the basis of time maintained in the routing along with formulas in work center w.r.t. quantity. Still this will not give you desired result i.e. available capacity without load for material as what would be the ratio in a day for each product.
Example you have 8hrs as mentioned and 5 materials use the same work center, you can calculate time required for each product by giving input as for 10pcs (the way we do while testing formula in work center) but it will not show you capacity per material as there is no ratio defined for materials.
I hope you got the point or let me know if I am missing something.
Regards
Rahul